____________is concerned with the production of high-volume standard products.
Routings are fixed and work centers are arranged according to the routing in ________________.
Flow of work through the shop is varied and depends on the design of a particular product. In _____________, as orders are processed, they will take more time at one workstation than at another. Thus, the work flow is not balanced.
An example of project manufacturing is
The __________________ contains a list of the single-level components and quantities needed to assemble a parent item.