Shortcut Navigation:
Page Content
Site Navigation
Footer
Create
Hello Guest
Quiz
Survey
Challenge
Quizific is the easiest free and fun way to take or make a quiz or survey
About
Help
Contact/Follow >
Tag Cloud
Our Competition
Sitemap
Thanks!
Contact Us
Facebook
Twitter
Google+
Temporary Profile
Forgot Password?
Create Account
Profile
Logout
Sigma Team Quiz
Which of the following methods is used to develop an exhaustive list of ideas about a subject?
A six sigma team has gathered data for a project proposal and is using the following notations.
I = Initial investment
C = Periodic maintenance cost
B = Benefits to be accrued
On the basis of the information above, which of the following is the criteria used to select a project?
In comparison to a full-factorial design of experiment (DOE), a traditional, one-at-a-time approach will
When the design for assembly is being evaluated, all of the following factors should be considered EXCEPT design for
An important aspect of data collection is that the data collector should
The process of having a six sigma team develop a problem statement helps the team
“Forming, Storming, Norming, and Performing” are terms that describe
For an F-test to be inferentially valid, all of the following assumptions must be true EXCEPT the
According to Juran, anyone is a customer of a product or service if that person
All of the following experimental designs can be used to investigate interactions EXCEPT
Tagged as:
sigma team
,
sigma team
,
design